Al Mafraq Hospital

Abu Dhabi, United Arab Emirates

First established in 1983, a US$870 million major expansion was completed to triple the treatment rooms to 690 beds - sufficient to cover the cities demand until post-2018. The site now spans an area of 306,803m2 with a built up area of 246,118m2 across four patient towers of 10-12 storeys including two Royal suites and 32 VVIP suites.

The following Gyproc systems were specified and used in the project:

  • GypWall CLASSIC, GypWall QUIET and GypWall QUIET SF is specified using our Gyproc DuraLine MR board to provide the required duty rating, fire performance and acoustic solutions.
  • GypLyner system used to encase concrete columns and beams.

Challenges

  • Stringent acoustic requirement between patient and treatment rooms of between 52-53dB.
  • High level of fire performance required to 120 minutes.
  • Severe duty rating required throughout to protect high traffic areas from impact.
  • American Standard (ASTM) compliance.
  • Level of training required to upskill the drylining installation teams of the four sub-contracting companies.

Outcome

Collaborative working with all parties ensured any site issues were resolved promptly and efficiently and a high level of training hours minimised many typical site problems. A SpecSure Warranty was also issued to guarantee the performance of Gyproc solutions in line with installation guidelines.

Project information

Client

SEHA - Government Health Authority, Abu Dhabi

Main contractor

Joint Venture: Habtoor Leighton Group & Murray-Roberts

Contractors

Al Massa, International Décor, Tradeline, Vancouver

 

Architect

Burt-Hill